Modernization
|
Elevators, Escalators, Material Lifts
Questions: 1-800-897-4051 or Internationally +1-860-677-5942
To successfully apply new technology to older lifts and enhance performance and reliability
we draw on our experience in both new construction and maintenance. Typically,
we computer model both the existing and the proposed systems.
These studies yield a series of before and after statistics including
average and maximum passenger waiting times, total trip times and car
loading percentages. This information allows the building owner to make
informed cost versus benefit analyses for various component families as well
as for the total system.
During modernization programs scheduling can be as important as technology.
We use our ability to predict reduced lift group performance along with our
experience in job scheduling and labor union negotiations to develop detailed
project schedules. Adherence to these schedules is verified by frequent,
as often as daily, job site inspections followed by punch list surveys
and acceptance testing.
|